Sign Permitting, Fabrication & Installation
Exterior signage often requires obtaining a permit from the city you are located in. Our staff is trained in “pulling” permits and knows when a permit is required, or not. All electrical signs require permits, but not all dimensional lettered signs require them in every city. We are familiar with the sign codes for most of the cities in Orange and Los Angeles Counties and will advise you as necessary.